Consumers Energy ~ Campbell Generating Station

West Olive, Michigan

Project Description

Unit 3 at the JH Campbell Station is Consumers Energy’s largest coal-fired generating unit generating up to 830 MW of power. Consumers Energy contracted with Boldt to erect a new air quality control system for this unit. This project required the construction of two Pulse Jet Fabric Filter (PJFF) baghouses, four Dry Spray Absorbers, air gas ductwork, lime process system and by products handling system.

This installation took advantage of the facility’s access to deliveries by lake barges. The baghouse modules and large ductwork were fabricated into assemblies that maximized the efficiency of assembly at the site. This method of deliveries presented significant challenges at the site for transportation and lifting these large modules into place. The sequencing of assembly and placement of large cranes on the site required close coordination with the remainder of the installation to assure minimal interference with other contractors and the operation of the plant during construction.

Boldt coordinated the work of the insulation, piping and electrical work along with many specialty subcontractors to complete this project.

BoldThinking®
The project schedule experienced several changes during the bid process due to the owner’s needs. Boldt continued to work collaboratively to modify the plan and schedule to address various delays, modifications to equipment deliveries and maintain schedule milestones and enhance production with modifications to the use of cranes and flow of manpower.

Learn more about our work in the energy market.

Architect/Engineer

Black & Veatch

Boldt's Role

General Contractor

Key Points

  • Unit 3 at the JH Campbell Station is Consumers Energy’s largest coal-fired generating unit generating up to 830 MW of power.