Piedmont Public Schools ~ Piedmont Intermediate Center

Piedmont, Oklahoma

Project Description

Construction on the Piedmont Intermediate Center was completed during the 2012-2013 school year. Utilizing innovative Lean construction techniques, Boldt compressed the project schedule from the typical 15 month duration to 12 months. The single-story intermediate school is 86,000 sq. ft. in size and is located on a 20-acre undisturbed site.

The building’s interior design features innovative use of curved and irregular surfaces. The exterior EIFS finish incorporates interesting design patterns as illustrated in the pictures above.

Learn more about our work in the education market.

Architect/Engineer

The Stacy Group

Boldt's Role

General Contractor

Key Points

  • The construction project on the Piedmont Intermediate Center included a dual classroom pod design, a new gymnasium, a commons, band and media centers, playing fields for baseball and football and two outdoor basketball courts.