Owner:
Rio Tinto
Architect:
M3 Engineering
Boldt Role:
General Contractor for Structural, Mechanical and Electrical Scope
Key Points:
95,000 hours were worked on the project without one OSHA recordable injury. Boldt worked with its own safety policies as well as safety guidelines from Rio Tinto, M3, Michigan OSHA, and the Mine Health and Safety Administration. Michigan OSHA officials were impressed by safety standards on site during each of their visits.
Rio Tinto
Water Treatment Facility
Michigamme, MI
Safety is a priority in any mining operation and Boldt’s rigorous commitment to safety during work on Kennecott Eagle Minerals Company’s (KEMC) Eagle Mine and Water Treatment Facility was no exception. Boldt was responsible for constructing a water treatment plant, power house, truck wash and other structural, mechanical and electrical work.
Ensuring area groundwater, streams, rivers and lakes remained protected from activities associated with mining was also a priority during the project. KEMC uses a state of the art reverse osmosis water treatment plant to purify water from operations (including rain and snow). The water is then returned to the environment through an infiltration system that slowly releases it back into existing groundwater.