Medical
Other Natural Gas Projects
- » Basin Electric Power Cooperative - Brookings County, SD
- PG & E National Energy Group - Covert, MI
- Union Electric aba Ameren UE - Bowling Green, MO
- Wisconsin Public Power - Kaukauna, WI
- Xcel Energy - Bayport, MN
- (See All)
Other Energy Projects
- Integrys Energy Group, Inc. - Green Bay, WI
- Eco Energy/Acciona - Lena, IL
- Wisconsin Public Service - Rothschild, WI
- Laurentian Energy - Hibbing and Virginia, MN
- We Energies - Rothschild, WI
- (See All)
Other Construction Management Projects
Owner:
Basin Electric Power Cooperative
Boldt Role:
Construction Manager
Key Points:
The preconstruction phase requires a constructability review of all design documents and drawings. The goal of this phase is to identify opportunities to improve efficiency and minimize potential problems in the field that could impact cost and schedule.
Basin Electric Power Cooperative
Deer Creek Station
Brookings County, SD
Boldt's scope for the project includes complete management and construction of the energy center. Included are all civil, structural, mechanical, piping, electrical and controls work associated with the installation of a one-on-one combined cycled plant.
The major equipment components to be erected by Boldt consist of one GE Class F Combustion Turbine, one Nooter/Eriksen HRSG, one Alstom Steam Turbine and one SPX Air Cooled Condenser. The combustion turbine and steam turbine are located in an enclosed structure with an attached administration building. The water treatment building is separate.
Boldt will provide civil/structural, boilermaker, and millwright skills as self-performed services.





