Project Description |
|
Key Points: Calpine Corporation is the general contractor for the project. Boldt has been awarded seven contracts to date, including utility rack assembly and the remaining structural steel platforms and building enclosures, ten pre-engineered buildings, steam turbine generator foundations and pedestals, miscellaneous equipment foundations in power block area, and the cooling tower foundation. Approximately 122,000 craftman-hours will be required. The tube bundles, steam drums and exhaust stack were set with Boldts Manitowoc 2250 crane. |
|